CHENGDU TRANSPORT GUIDE

How to use the Chengdu Metro

The Chengdu Metro helps foreign visitors cross the city, avoid road traffic and reach both airports, major railway stations and many attractions.

Plan a route, spot the right station entrance, choose a payment method and follow the signs from street to platform.

THE SHORT ANSWER

Use Chengdu Metro to travel between the city, airports and rail hubs.

Chengdu Metro links central districts with both airports, major railway stations and many popular areas, making it a practical option for avoiding road congestion. Plan each journey around your exact origin and destination, then check AMap for current transfers, station exits and operating times.

01 · WHEN TO TAKE IT

What journeys is the Chengdu Metro good for?

Choose the metro when your origin and destination are near stations and you want to avoid road congestion. It works well for moving between central districts, intercity rail hubs and the airports. It does not take you to every attraction door: compare the final walk or bus connection in AMap.

Good fit

Cross-city trips, airport or railway access, and places connected by a direct line or straightforward transfer.

Plan another leg

If your destination is beyond walking distance of a station, include the final bus, shuttle, taxi or walk in your route.

02 · FIND THE STATION

How do I recognize a Chengdu Metro station?

Look for the blue Chengdu Metro logo and the word Metro on street signs, then follow the wayfinding signs to an entrance.

Chengdu Metro logo with Chinese text and the words Chengdu Metro
Look for this complete logo. The blue symbol appears with “成都地铁” and “CHENGDU METRO” on station entrances and wayfinding signs.
Official Chengdu Metro and rail transit network map showing operating lines, station names and interchanges
Official Chengdu rail transit network overview. Use the line number and color to trace a route and its interchanges; check the operator map for current service before travelling.
Street-level Chengdu Metro wayfinding sign FOLLOW THE METRO SIGN
Follow the Metro wayfinding signs to the station entrance.
Chengdu Metro entrance sign above a station entrance FIND THE ENTRANCE
Enter where the Metro symbol and station entrance sign are displayed.

05 · ROUTE EXAMPLE

How do I plan a metro route in AMap?

Enter the exact start and destination, choose public transport, and compare the complete journey—not only the Metro portion. Check the total travel time, walking distance, transfers, final bus or shuttle, arrival gate and fare, then reopen the route shortly before departure.

Example: Chunxi Road to the Panda Base

In AMap, set Chunxi Road Pedestrian Street (春熙路步行街) as the start and Chengdu Research Base of Giant Panda Breeding (成都大熊猫繁育研究基地) as the destination. This supplied public-transport result shows about 53 minutes, 9 Metro stops, roughly 1.2 km of walking, Line 3 and the 409 Short bus, at about USD 0.90 (RMB 6). Confirm the exact attraction pin and gate because live routes, fares and journey times can change.

Use the route as a live example, not a timetable.

AMap may offer a different station, bus, gate or faster route depending on your departure time and the Panda Base entrance you select. Before leaving, reopen directions and confirm the 409 service, stop names and final walking leg. If the app instead offers Line 3 to Panda Avenue (熊猫大道) with the 408 shuttle, follow the current app itinerary and the Base's official transit instructions.

AMap search results for panda, showing Chengdu Research Base of Giant Panda Breeding as the first resultATTRACTION RESULT
Find the correct attraction. Check the Chinese name and attraction category before tapping.
AMap public-transit route options from Chunxi Road Pedestrian Street to the Panda BasePUBLIC TRANSPORT ROUTE
Compare the complete itinerary. This supplied screenshot shows the Metro plus 409 Short option at 53 minutes and about USD 0.90 (RMB 6), with other alternatives below.
Open the full Chunxi Road to Panda Base example

What does the Chunxi Road to Panda Base route look like step by step?

  1. Walk to Chengdu Second People's Hospital Station (市二医院站), Exit A. The example route begins with a 926 m walk (about 17 minutes) from Chunxi Road Pedestrian Street (春熙路步行街); check your actual start point and the correct entrance in AMap.
  2. Enter Line 3 toward Chengdu Medical College (成都医学院). Follow Line 3 signs and ride to the transfer point shown in your current itinerary.
  3. Follow the transfer signs to the 409 Short bus. Chengdu bus-stop names are usually shown in Chinese pinyin rather than translated into English, so match the romanized name on the stop sign or bus display. In this AMap example, the stop is DiTie JunQu ZongYiYuan Zhan (地铁军区总医院站), with service toward XiongMao JiDi (熊猫基地).
  4. Get off at XiongMao JiDi (熊猫基地) and walk about 192 m (3 minutes) to the Chengdu Research Base of Giant Panda Breeding (成都大熊猫繁育研究基地) pin shown in this route.

Where is the Metro Entry Guide in the route?

In AMap's detailed directions, tap Metro Entry Guide beside the departure station when it appears. It opens a station-specific photo sequence showing which street entrance to use. In this example, the entry guide starts at Chengdu Second People's Hospital Station (市二医院站), Gate A; follow the live route's entrance letter rather than assuming every station uses the same entrance.

AMap Metro Entry Guide for Chengdu Second People's Hospital Station, showing the route downstairs from the street entranceENTRY GUIDE · DEPARTURE
Metro Entry Guide · Go downstairs at the indicated entrance. The AMap guide is tied to the selected station and route; confirm the Line 3 label and entrance letter on site.

Where is the Metro Exit Guide and how do I reach the bus?

At the transfer-side Metro stop, open Metro Exit Guide in AMap's step-by-step directions. Follow the pictured exit and continue to the 409 Short stop. Your screenshot identifies the stop as DiTie JunQu ZongYiYuan Zhan (地铁军区总医院站), near the Panda Base's west-side access; the next leg shown is bus 409 toward XiongMao JiDi (熊猫基地).

AMap Metro Exit Guide showing the Line 3 station exit for the Panda Base west-side connectionEXIT GUIDE · CONNECTION
Metro Exit Guide · Follow the station-specific exit, then the bus-stop pin. Exit B and the west-side gate apply only when they match your live itinerary; the image is a visual aid, not a universal station instruction.

After the metro: how do I take the 408 shuttle from Panda Avenue to the Panda Base?

For the South Gate, continue from Line 3 at Panda Avenue (熊猫大道站) to shuttle 408. Current official guidance says to use Exit A. The supplied firsthand photos instead show an Exit D sign and stop, demonstrating that local arrangements can differ. Start with the official Exit A guidance, then follow the live bilingual signs and confirm the 408 / South Gate destination with station staff if the signs disagree.

  1. At Panda Avenue (熊猫大道站), follow the bilingual Panda Base / South Gate signs after leaving the train.
  2. Start with Exit A, as listed by the Base’s current official guidance. If live bilingual signs instead direct passengers to another exit—such as the Exit D shown in the supplied photos—follow the current sign and confirm with station staff.
  3. At street level, find the signed 408 shuttle stop. Before boarding, check the route board and bus display for Panda Base (South Gate) (熊猫基地南门).
  4. Ride shuttle 408 to the South Gate, then follow the entrance signs into the Base. These photos show the stop, bus front and cabin so you can recognize the last leg.
Official route and field observation differ

Plan with the Panda Base’s current official instruction: leave Line 3 at Panda Avenue (熊猫大道站), use Exit A and take shuttle 408 to the South Gate. The supplied firsthand photos record Exit D instead. Because exit assignments can change, follow the live bilingual signs and confirm the 408 / South Gate destination with station staff if they disagree with the official page.

Personal route screenshots supplied for this guide. AMap directions, walking estimates, arrival times, fares, station exits and shuttle services are dynamic. Recheck the route on the day and compare the final destination pin with the official Panda Base transit page.

See the step-by-step AMap route-planning guide →

03 · ENTER & BUY A TICKET

How do I enter the station and pay for the ride?

After finding the entrance, pass the security check first. Before the fare gate, choose one payment method: tap a supported contactless bank card, scan an activated Chengdu Metro Ride Code (成都地铁乘车码) in Alipay, or buy a single-journey ticket.

  1. Pass security: place bags on the scanner and walk through the security check.
  2. Choose how to pay: use a contactless bank card, the Chengdu Metro Ride Code in Alipay, or buy a single-journey ticket before approaching the gate.
  3. If you need a ticket: choose English on the machine, select the destination and quantity, pay and collect the ticket. Ask the staffed Customer Service Center if the machine is unclear.
  4. Enter and exit consistently: use the same physical card, the same mobile-wallet card, the same Alipay ride code or the same ticket at both gates. One payment credential covers one passenger.
Official Chengdu Metro video · Using a bank card at the fare gate. The bilingual guide shows where to tap, reminds passengers to use the same supported card at entry and exit, and explains how to ask station staff for help.
Chengdu Metro fare gates with contactless bank-card readers and supported-card logos 04A · TAP A CONTACTLESS CARD HERE
Look for the contactless target and supported-card logos. Tap the same physical card—or the same card in the same mobile wallet—when you leave. Do not enter with the plastic card and exit with its phone-wallet version.
A visitor's American Express card being tapped at a Chengdu Metro reader during a firsthand test
Firsthand test supplied for this guide: An American Express card worked at this Chengdu Metro reader on the photographed trip. This confirms that card worked once; it does not guarantee that every card or issuer will approve every tap.
MethodWhat to doWhat can fail
Contactless bank card at the gateAt all Chengdu Metro stations, tap a supported UnionPay card or an overseas-issued Visa, Mastercard, American Express, Diners Club or Discover card on the marked reader. Enable contactless and small-value no-PIN payments with your issuer first.The card can still be declined by its issuer, have insufficient credit, lack the required contactless setting or fail at a particular reader. Carry a second supported card.
Alipay Chengdu Metro Ride CodeIf your Chengdu Metro Ride Code (成都地铁乘车码) is already active in Alipay, open it before joining the queue and scan it at entry and exit. For activation and overseas-card setup, use the separate Alipay guide.The code needs a verified Alipay account, a charged phone and working network access. Keep a bank card or single-journey ticket as backup.
Automatic ticket machineChoose English, select Single Journey Ticket, choose the destination and ticket quantity, then pay and collect the ticket. Current official policy allows the supported bank-card types above at metro ticket machines. Where the machine displays it, Alipay QR checkout may also be available; use RMB cash only where the machine shows cash acceptance.Buttons, readers and payment routes can differ by machine or be temporarily unavailable. Trust the options and logos shown on the machine, then try another machine or the staffed center.
Staffed Customer Service CenterShow the destination station in Chinese and ask for a single-journey ticket. Staff can confirm the fare and the payment methods currently working at that station.Keep a supported physical card and some RMB cash. If needed, call the Chengdu Metro service hotline: 028-61638000.
Officially supported does not mean every tap is guaranteed

A foreign credit or debit card may still be rejected because of issuer security controls, contactless/no-PIN settings, available credit, wallet tokenization or a reader fault. Step away from the gate, try a second supported card, open the Chengdu Metro Ride Code in Alipay, or buy a single-journey ticket. Never repeatedly tap different cards while the gate is processing.

A foreign visitor choosing a ticket at Chengdu Metro automatic ticket machines
Buying a single-journey ticket: choose English on the machine if available, select your destination and passenger count, then pay using one of the methods shown on that machine. A staffed Customer Service Center can help if the screen or payment option is unclear.

Need to activate the Chengdu Metro Ride Code first? Use the Alipay guide for foreign visitors; this page continues from the point where the ride code is ready to scan.

04 · YOUR FIRST RIDE

What happens after I pass the fare gate?

  1. On the concourse: follow the line number, color and terminal station direction. At an interchange, follow signs for the connecting line without leaving the paid area.
  2. On the platform: confirm the line, direction and next-train display. Let passengers exit before boarding and keep clear of the platform doors.
  3. At your destination: follow the station name on the display, then exit with the same card, Alipay ride code or ticket method used to enter. Check the fare gate response before walking away.
  4. At street level: follow the correct exit number to reach the intended side of the road. Add the final walk, bus or shuttle shown in your route.

06 · FARES & SERVICE

How much does it cost, and when does the metro run?

Chengdu Metro uses distance-based fares. The base fare is about USD 0.30 (RMB 2) for up to 4 km. After that, add about USD 0.15 (RMB 1) at each distance band: every 4 km from 4–12 km; every 6 km from 12–24 km; every 8 km from 24–40 km; every 10 km from 40–50 km; and every 20 km beyond 50 km. The fare display or route search gives the exact trip price.

Network operations currently extend from around 06:00 to 00:43, but each line, station, direction and date can have a different first or last departure. These network-wide bounds are not a promise that a train will be available at your station at those times. Check the Chengdu Metro app, official website or station display before an early airport trip, late arrival or transfer. Holiday and event timetables may be extended.

Lines meet at signed transfer stations. Follow the line number and color through the transfer corridor and remain inside the paid area. If signs direct you out through fare gates, treat it as a separate station or out-of-area transfer and check the station instructions before continuing.

USD fare equivalents are approximate. Conversion uses USD 1 = RMB 6.6702, the U.S. Federal Reserve H.10 reference for October 23, 2026, the latest published official rate available during this check. Your card issuer may use a different rate or charge a fee. Fares are collected in RMB. Federal Reserve USD/CNY reference. Fare bands and the network-wide operating span are from Chengdu Rail Transit Group disclosures; station-specific schedules take precedence.

07 · AIRPORTS & TRAINS

Which metro lines connect the airports and high-speed railway stations?

Chengdu Tianfu International Airport (成都天府国际机场 · TFU)

Follow the Ground Transportation Center signs to Terminal 1 & 2 of Tianfu International Airport Station (天府机场1号2号航站楼). Use Line 18 for central Chengdu; Line 19 also links the two airports and western connections. Check the display for direct and all-stops trains.

Open the Tianfu Airport transport guide →
Chengdu Shuangliu International Airport (成都双流国际机场 · CTU)

Line 10 serves both airport terminals. Lines 19 and 30 use the separate Shuangliu Airport Terminal 2 East Station (双流机场2航站楼东), which is linked to Terminal 2 by a signed out-of-gate walk.

Open the Shuangliu Airport transport guide →
Chengdu East Railway Station (成都东)

Use metro Chengdu East Railway Station (成都东客站) on Lines 2 and 7. Allow time to walk from the metro concourse through railway security to the train gate.

Chengdu South Railway Station (成都南)

Use metro South Railway Station (火车南站) on Lines 1, 7 and 18. Confirm that your train departs from Chengdu South (成都南), not another Chengdu station.

Chengdu West Railway Station (成都西)

Use Chengdu West Railway Station (成都西站) on Lines 4 and 9. Match the Chinese railway station name before starting the metro trip.

For a booked train, match the Chinese station name on your ticket before choosing a metro destination. Chengdu has several railway stations. Read the Railway 12306 guide to station names and train tickets →

08 · WHEN SOMETHING FAILS

What if payment, the QR Code or mobile internet fails?

ProblemTry thisBackup
Card rejected at gateUse the contactless target and check that small-value contactless is enabled and the card has available credit.Try another supported card, Alipay or buy a ticket at the machine/service center.
QR Code will not loadMove out of the queue, reconnect to Wi-Fi/mobile data, reopen the active Chengdu Metro code and raise screen brightness.Tap a contactless card or purchase a single ticket.
No mobile dataUse station Wi-Fi if available, but do not assume the code will work offline.Use a physical card or RMB cash at a machine/service center.
Machine or payment option failsSwitch to English if offered, try another machine and show the destination’s Chinese name to staff.Visit the staffed Service Center; keep some RMB cash.
You entered the wrong station or lost a ticketDo not force a gate. Go to the Service Center and explain the entry station or show your payment record.Ask staff to help settle the trip before leaving.

Keep the phone charged, carry one physical payment card and a small amount of RMB, and save the hotel address in Chinese. If all payment methods fail, ask the Service Center to direct you to a working ticket option.

09 · READ STATION NAMES

Which English, pinyin and Chinese station names should I know?

Station signs use Chinese with English or romanized names. AMap, Alipay and Railway 12306 may remove spaces or use railway pinyin instead. Match the Chinese characters when two results look similar.

Name used in this guideSearch text you may seeChinese station nameConnection
Chunxi RoadChunxi Road · Chunxi Lu春熙路Lines 2 and 3
Panda AvenuePanda Avenue · Xiongmao Dadao熊猫大道Line 3; Exit A for the 408 shuttle to the South Gate
Chengdu East Railway StationMetro: Chengdu East Railway Station
Rail ticket: Chengdudong
Metro: 成都东客站
Rail ticket: 成都东
Lines 2 and 7
South Railway StationMetro: South Railway Station
Rail ticket: Chengdunan
Metro: 火车南站
Rail ticket: 成都南
Lines 1, 7 and 18
Chengdu West Railway StationChengdu West · Chengduxi成都西站Lines 4 and 9
Terminal 1 & 2 of Tianfu International AirportTianfu International Airport T1 & T2天府机场1号2号航站楼Lines 18 and 19
Shuangliu Airport Terminal 2Shuangliu Airport T2双流机场2航站楼Line 10
Shuangliu Airport Terminal 2 EastShuangliu Airport T2 East双流机场2航站楼东Lines 19 and 30
Railway and metro names can differ

Railway 12306 uses Chengdu East (成都东) and Chengdu South (成都南) for train tickets, while the connected metro stations are Chengdu East Railway Station (成都东客站) and South Railway Station (火车南站). Match the Chinese name on the train ticket before choosing a metro destination.

Check current line and interchange assignments on the official Chengdu Rail Transit network map; spellings in apps may omit spaces or use a slightly different romanization.

10 · FAQ

Chengdu Metro questions from first-time visitors

Can I tap a foreign bank card directly on the gate?

Yes. Supported contactless UnionPay and overseas-issued Visa, Mastercard, American Express, Diners Club and Discover cards are accepted across the network. Enable small-value contactless payment with your bank, and keep another way to pay ready.

Can ticket machines accept a foreign credit card?

Official policy says automatic ticket machines accept the same supported UnionPay and overseas-issued Visa, Mastercard, American Express, Diners Club and Discover cards for single-journey tickets. Authorization can still fail, so use the on-screen Alipay option where shown, RMB cash where accepted, or ask the Customer Service Center.

Do I need a Chinese phone number for the Chengdu Metro Ride Code in Alipay?

The Chengdu Metro Ride Code (成都地铁乘车码) is activated inside Alipay. A Chinese phone number is not always required, but eligible overseas numbers and verification prompts vary by account and region. Set it up before you travel and keep a bank card or ticket as backup.

Is the Panda Base inside a metro station?

No. Line 3 connects to two Panda Base shuttles: Military General Hospital (军区总医院站), Exit B, for shuttle 409 to the West Gate; or Panda Avenue (熊猫大道) for shuttle 408 to the South Gate. Current official guidance says to use Exit A for shuttle 408 to the South Gate. The supplied firsthand photos record Exit D instead, so follow the live bilingual station signs and confirm the 408 / South Gate destination with station staff if they disagree.

Are Shuangliu Airport Terminal 2 and Terminal 2 East the same metro station?

No. Shuangliu Airport Terminal 2 (双流机场2航站楼站) on Line 10 and Shuangliu Airport Terminal 2 East (双流机场2航站楼东站) on Lines 19 and 30 are different stations. The connection requires leaving the paid area; transfers completed within 30 minutes are currently continuously priced. Check the full station name and signs.

Do I have to buy a new ticket when changing lines?

No, for normal transfers within the paid area. Follow the transfer signs and do not exit through the fare gates. If a transfer route requires leaving the paid area, check station instructions and fare rules.

Does Chengdu Metro operate all night?

No. Network service spans roughly 06:00–00:43, but exact first and last trains differ by station, direction and date. Use the official live route information, especially for an airport connection.

Can I pay in US dollars?

No. Metro fares are charged in RMB. USD figures here are approximate comparisons; your bank or card network sets its exchange rate and may add a fee.

OPTIONAL · A CITY EXPERIENCE

Why is the Chengdu Metro worth experiencing, not just using?

Because it can double as a public-design tour. Newer and rebuilt stations use sculptural ceilings, bold materials and distinctive color, while bilingual signs keep the system practical for a first-time foreign visitor. You do not need to cross the city only for a photo, but if an interesting station is already on your route, allow a few extra minutes to look around.

Green and white wave-shaped ceiling installation inside a Chengdu Metro station
The metro is part of Chengdu's contemporary public design. Station interiors can turn an ordinary transfer into a short architecture stop.
Bright white arched interior and polished floor inside a Chengdu Metro station
Large halls use strong symmetry, light and clear sightlines.
Large white suspended ceiling installation above a multi-level Chengdu Metro concourse
Ceilings and concourses can be architectural features in their own right.
Line 13 train and bilingual platform signs at Wenweng Shishi Station in Chengdu
Wenweng Shishi Station (文翁石室站) shows the bilingual line, direction and next-station information used on newer platforms.

Enjoy the design without blocking the journey. Station architecture varies. Keep gates, stairs, escalators and platform doors clear, follow staff instructions, and photograph only where it is safe and permitted.

SOURCES · CHECKED NOVEMBER 2, 2026

Official information used for this guide

Live timetables, station arrangements, payment acceptance and route suggestions may change. The station display and official live information take precedence over a saved guide.

RELATED GUIDES

Plan the rest of your Chengdu trip